2021 Fern Hollow inspection report

- Page 52 - Bottom photo CUTLINE: A photo taken in September 29, 2021, during the inspection of Fern Hollow Bridge shows the severe corrosion to the southwest frame leg's connection to the bottom of the top cross-frame bracing that inspectors wanted repaired. Credit: Gannett-Fleming #fernhollowbridgereport

tpecyna
tpecyna@post-gazette.com

 

June 13, 2022